Project Objective
To provide additional Lorry Load In capacity for Immingham Renewable Fuels Terminal.
What We Did
A detailed 3D model was created from clients drawings and designs. To allow both civils and structural works to be undertaken simultaneously the Structure was erected and clad in a temporary location. The whole building was then lifted into position in a single lift with a 500 Tonne mobile crane.