Project Description

    Gladstone Biomass

    Rail Load Out Silo Roof Steelwork

    Project Objective

    Supply and erection of Steel Silo Roof Structure

    What We Did

    We developed a 3D model from the clients design drawings.

    Due to working at height dangers and restrictions, we decided to build the full structure at ground level. The whole rood structure weighing in excess of 40 tonnes, was then lifted into position on top of the 46m high concrete silo.

    The lifting phase was completed in a single shift.

    Call 01469 540 644 to see how we can help