Immingham Renewable Fuels Terminal

Main Silo Access Stairs & Steel Structures in Immingham.

Project Objective

To provide safe access to 4 55m high Silos involving 2% full height access steel staircases and 4% walkways & bridges for Immingham Renewable Fuels Terminal.

Gallery

  • Immingham Renewable Fuels Terminal | Fussey Engineering
  • Immingham Renewable Fuels Terminal | Fussey Engineering
  • li>Immingham Renewable Fuels Terminal | Fussey Engineering li>Immingham Renewable Fuels Terminal | Fussey Engineering li>Immingham Renewable Fuels Terminal | Fussey Engineering

What We Did

3D models of all steel structures were developed from the client's structural designs.

The main staircases were erected in a modular form to avoid the need for costly access scaffolding.

Bridges and walkways were assembled at ground level, with completed steel structure lifted into place to reduce the need to work at height.