Harrods Roof & Walkways

Over long contract period of regeneration of steelwork to Harrods roof - including walkways and HVAC support steel.

Project Objective

Regeneration and modernization of steel structures on Harrods roof and constant maintenance throughout the store both directly for Harrods and for various other main contractors.

Gallery

  • Harrods Roof | Fussey Engineering
  • Harrods Roof | Fussey Engineering
  • Harrods Roof | Fussey Engineering
  • Harrods Roof | Fussey Engineering
  • Harrods Roof | Fussey Engineering
  • Harrods Roof | Fussey Engineering

What We Did

We performed regeneration work to existing HVAC systems on Harrods roof, over a 2-3 year period, using approximately 180 tons of steel.

In addition, we also refurbished and installed support steelwork for various projects.

We also fabricated various steel access walkways, ladders and staircases across the rooftop area.

Additional Projects

“By Appointment” - This project involved moving 30 ton pf small piece material throughout the store to be erected on the roof.

Sports tunnel - The scope of work for this involved the design, fabrication, galvanising and transporting steel throughout Harrods store in piece small sections to be spliced and erected on site, to avoid unecessary road closure and cranage.

Franchised store areas - This work involved the fabrication, design and erection of steel support frames, supsended ceilings and staircases for various well-known brands within the Harrods store. It also involved internal strengthening and refurbishment to accomodate this steelwork.

Memorial Statue - We also provided additional support steelwork to the famous memorial statue within the Harrods store.

Fussey Engineering