Aldbrough Gas Storage Facility

The Fabrication, Surface Treatment, Supply and installation of 8 no. Well Head Access Structures.

Project Objective

To supply and install permanent access structures to 8 no. underground Well Heads. Ensuring each structure provided safe access to key pieces of plant and equipment within each Well.

Gallery

  • Aldbrough Gas Storage Facility | Fussey Engineering
  • Aldbrough Gas Storage Facility | Fussey Engineering

What We Did

Fussey developed the clients original design concept to meet the individual access requirements for each Well Head.

Detailed surveys were undertaken for each structure and 3D models were produced for clients approval. Existing Well Head support structures were removed and refurbished. With the new access structures being installed during process shut down periods, with round the clock working to ensure plant process requirements were maintained.

With a project duration of over 18 months, we are justifiably proud to report that for this particularly safety critical project Fussey Engineering produced 8 no. high quality structures, delivered on time without a single incident.